Cloud migration services, explained end to end
On this page
Cloud migration services exist because moving to the cloud is a sequencing problem wearing a technical costume. Every tool you need already exists and works; migrations fail on undiscovered dependencies, network surprises, and rushed cutovers. A good migration partner removes those three risks, not by being clever, but by being disciplined. This page walks the whole path and links the deep-dive guide for each phase, so you can read top to bottom or jump to the step you are on.
Phase 1: Strategy and discovery
Before anyone touches a cloud console, you need two things: a plan and an inventory.
- Pick a strategy per application. Not everything should move the same way. The cloud migration strategy playbook covers the 6 Rs, and lift and shift vs replatform vs refactor helps you choose per app. The sequenced plan lives in the cloud migration roadmap.
- Discover before you design. You cannot move what you cannot see. Dependency mapping against live traffic is the step teams skip and regret at 2 a.m.
Phase 2: Choose the destination
The right cloud depends on your stack, skills, and compliance needs. Compare the options in how to choose a cloud provider, then go deep on AWS, Azure, Google Cloud, DigitalOcean, or Oracle Cloud. If budget is the deciding factor, the AWS vs Azure vs Google Cloud pricing comparison and the on-premise vs cloud TCO model are the place to start.
Phase 3: Build a secure landing zone
Stand up the cloud properly before workloads arrive: a cloud landing zone with separate accounts, SSO, guardrails, and centralized logging, plus the security foundation, IAM best practices, the shared responsibility model, and SOC 2 / HIPAA / GDPR compliance. Getting this right first is far cheaper than retrofitting it later.
Phase 4: Migrate in waves
With the destination ready, the move happens in groups, not all at once. The deep-dive guides cover the common paths:
- Migrate on-premise to AWS and migrate to Azure for full-estate moves.
- Migrate a database to the cloud and migrate file storage to the cloud for data-heavy workloads.
- Migrate a monolith to the cloud and containerize before migrating when modernization is part of the move.
Phase 5: Cut over with minimal downtime
Each wave cuts over in a short, controlled window. The zero-downtime cloud migration playbook covers continuous replication and blue-green patterns, and cloud backup and disaster recovery makes sure you can roll back if a wave misbehaves.
Phase 6: Tune cost and keep it tuned
The migration is not done at cutover; a cloud bill left unmanaged drifts. Estimate the cost up front, then avoid bill shock, rightsize, and use reserved vs on-demand pricing to lock in savings once usage is steady.
Where to start
If you are early, read the strategy and roadmap playbooks. If you know what you are moving and want a partner to run it, talk to the Webisoft cloud team: we scope a bounded discovery first, so you get a real timeline and number before committing to the move.
Frequently asked questions
What do cloud migration services include?
A full engagement covers discovery and dependency mapping, a migration strategy per application (the 6 Rs: rehost, replatform, repurchase, refactor, retire, retain), landing-zone and network setup, the migration itself in waves, cutover with minimal downtime, and post-migration cost and security tuning. You can buy the whole path or just the phase you are stuck on.
How much do cloud migration services cost?
Cost is driven by the number of applications, how tangled their dependencies are, how much must be re-architected versus lifted and shifted, and your change-window constraints, not by data volume. Most of the bill is senior engineering time during discovery and waved cutovers. A bounded discovery and assessment is the cheapest way to get a real number before committing to the move it de-risks.
How long does a cloud migration take?
A single self-contained app can move in under a month. A 20-80 server estate typically runs 3 to 9 months end to end: a few weeks of discovery, one to two weeks for the landing zone, then migration waves of two to four weeks each. Dependencies, testing, and change-freeze windows set the timeline far more than transfer speed.
Which cloud should we migrate to?
It depends on your existing stack, team skills, compliance needs, and workload shape, not on which provider is biggest. The guide on choosing a cloud provider and the three-way AWS vs Azure vs Google Cloud pricing comparison both help you decide before you commit.
Can you migrate with zero downtime?
Near-zero, yes, for most systems. Continuous replication keeps the cloud copy seconds behind production, so each cutover is a short low-traffic window. Systems that cannot take even that use a blue-green pattern with gradual traffic shifting. The zero-downtime playbook covers the machinery.